One, unit request:
Hold because of carrying cover of shredded tobacco for water pipes is reached accuse a system to have a few special requests to water and electricity, consequently must my factory is expedited or designation professional unit.
As apply just should furnish as follows condition:
1, the alternating current of contented bear
2, hydraulic the fountainhead that surmounts 0.05MP
3, contented plant site
2, use a method:
1, device ends, enter fill of the agent that change oil case of the agent that change oil inside, fill orders about to cubage 2/3, insert electrify source. The number is shown board bright, show hour, use formal switch by the hand, the hand moves formal switch indicator light to shine, cut down of the electromagnetism that drink water breaks up to drink water actively, warning apparatus cries, when waiting for water level to enter regular size, warning apparatus cries, water pump can work actively, enter hold control a process.
2, adjust hold control a process:
A, adjust add water hour actively: Press after adding water actively to drive crucial point, press ▼ key again, move to hour 3 minutes to order about.
B, adjust gush to spend fat dose hour: ▼ key is pressed again after pressing gush to change fat dose to bolt, tone comes add hour of the agent that change oil to make an appointment with: The type that hang a wall 3 seconds, clothes closet type: Odd pump 9 seconds, double pump 10 seconds, spell table to be 5 seconds.
C, adjust hour of total cycle time: Key is adjusted by ▼ again after pressing total cycle time to bolt, tone makes an appointment with 35 minutes to hour of total cycle time.
D, adjust water lukewarm concave and convex: Press overheat lukewarm accuse key to adjust key by ▼ again, tone comes hold accuse temperature, it is 65 ℃ normally.
E, use an end, need to stop when machine, stop by active key machine.
F, use vital part by stop, when adjusting key by ▼ again, the number is shown all answer 0, time from the beginning.
Hour of G, active water supply is 1 ― 10 minutes adjustable (water supply and gush change interval of fat dose center to always be 5 minutes) , the hour that gush spends fat dose is 15 seconds adjustable, total cycle time is 30 ― 90 minutes adjustable.
3, technical parameter
1, each loop hour: 50 minutes
2, write clear water hour: 2 minutes / every circulate
3, spend fat dose hour via entering: 4 seconds / every circulate
4, the pressure that drink water: Be more than 0.05MPa
5, exercise is hydraulic: 0.15MPa ― 0.20MPa
6, water pump power: 220V/0.75kw
7, cistern cubage: 108 litres
8, type of the agent that change oil: VEnt.Clean
9, water pump displacement: 60 litres / cent
The article arranges storage-rack.onsonhardware.com of processing factory of drill rod solder