Edge slope is flexible defend network unit process
(1) edge slope is flexible defending network unit process presses program paralell connection is spot practice relief undertake to steel column and anchorage lever bedrock measure locates. The spot puts line length to should increase about 3 ~ than program system length 8% , rise and fall to relief bigger, upper limit is taken when the system finds a place for same contour line shows hard edge to find a place for point-blank (8% ) ; Evener to relief regulation, the system finds a place for basically can be in when the edge finds a place for point-blank, same contour line gets off (3% ) ; On this bedrock, column is apart from but promising plans to be apart from of 20% shorten or broaden adjusts dimensions. (2) base hole excavate (not large to overburden place, come when excavate base cliff and when having notting arrive at program deepness, be in base the office of anchorage opening position inside hole drills hole of authentic anchorage lever, need anchorage staff) of Tong of bedrock of upside of perfusion of the ability after lunge radical cliff notes an oar.
(3) bury anchorage lever beforehand and perfusion bedrock Tong (to rock bedrock, 2, 3 working procedure should be aperture of lever of the anchor that get authentic and anchorage lever device, to Tong bedrock, yi Ke is after perfusion bedrock Tong) of drilling unit anchorage staff.
(4) base unit: Cover base foundation bolt and screw with screw cap.
(5) steel column and go up device of the rope that pull anchor
(6) the unit that side pulls anchorage string: Plant measure is Alexandrine the rope that pull anchor, going up merely undertake after fit of the rope that pull anchor is good.
(7) go up supportive rope device
(8) next supportive rope device
(9) the device of steel rope net
The article arranges Http://storage-rack.onsonhardware.com/ of factory of Guangdong hardware storage rack